Tuesday 12 November 2013

The 2nd Progress so far

Leylandii Removed from the side of the 2nd (Horrible Things) Not many left on the course now!
 
 
Topsoil Being Stripped ready for stock pilling to be used at a later stage

 
 
Topsoil Stock Piles to be used once final sub soil grading has been approved and when ground conditions permit.
 

Subsoil Shaping has began, all reusable turf stripped and reused around the course

 
Green Extension - Subsoil has been shaped and new drainage installed to the green extension

 
 
Greens Extension - Gravel Carpet being installed above the drainage runs.