Subsoil shaping has been completed for the new 6th Tees
Drain Installed through the middle of the Tee, linking into the new road drain
New Pathway being shaped
70/30 Rootzone being tipped ready for grading, approx. 100 tonne will be required to create a dry level teeing surface.