Work Progress Jan/Feb 1

 The Weather was terrible through Jan/Feb however work carried on at a pace

1st Tee had drainage Installed
 2nd was almost completely Turfed
Lely Installed new water fountain in new 2nd Lake concreted to the base so hopefully this one does not disappear.