Tuesday, 12 March 2013

Drainage Work Coming to an End



The drainage work carried out this Autumn & Winter is finally coming to an end.  Many area's have been tackled across the whole site.  (Well over 700 Metres) a full list of area's drained has been emailed to all members in my monthly report.  It also details what results can be expected from the hard work carried out by the team.


Major work has included the draining of the 7th Fairway/Rough, the bottom of the 4th Fairway,  right of the 9th Fairway to the 7th and across the 14th Fairway.

Many of the smaller area's tackled such as the 30 metres of drainage to the right of the 13th Green or the work behind the 3rd green have been dug out by hand.  This has been a hugely physical job for the team, working up to there necks in water and mud.
 
 
Then we have had so many old clay drains begin to pull water again due to the permanently high water table which has cause major problems were they are blocked. Again most of these repairs have involved hand digging into working plastic drainage as its just been too wet to get machinery over to the area of work.

 
We have also added a Steel Drain across the 1st Road to try and trap all the water that sheds off the 8th hole which then floods the 1st Tee Path and starters Hut.
 

 
 
The 7th has had 50 Metres of 150mm pipe installed across it to hopefully catch all the water that runs across the hole via old drainage and surface water.  The picture below shows the water flowing out of it already.
 